Clean Energy Service
The comprehensive utilization project of industrial waste gas and heat from Chongqing Iron & Steel (Group) Co. Ltd with the total installed capacity of 354MW can meet more than 75% of the electricity demand of the new plant of Chongqing Iron & Steel, basically realize the recovery of all the released gas, and save 750,000 tons of standard coal annually. Chuanwei Dry Coke Quenching and Sintering Waste Heat Power Plant: A project that can save 138,000 tons of standard coal and reduce carbon dioxide emission
Lu'an Thermal Power Plant: A project that produces 4.656 million tons of steam and 870 million kilowatt-hours of electricity every year. Ningxia Antai Coal-bed Methane Power Plant: The project, including the Shizuishan Gas Power Station, Wulan Gas Power Station, Shitanjing Gas Power Station, has a total installed capacity of 32.4 MW.
Lafarge Cement Waste Heat Power Plant: A project that can save 30 percent of energy every year, with an annual generating capacity of 200 million kilowatt-hours, saving 71,000 tons of standard coal and reducing 176,000 tons of carbon dioxide emissions. HNG Glass Kiln Waste Heat Power Plant: A project with an annual generating capacity of 6 MW, saving 11,200 tons of standard coal and reducing 27,300 tons of carbon dioxide emissions.
Energy Saving Transformation of Gas Compression Stations of West-East Gas Pipeline Project: Together with PetroChina and GE, CECEP has worked on the project for the utilization of waste heat of gas engine tail gas at the gas compression stations on PetroChina’s West-East Gas Pipelines.
 Home 
 Previous 
 Next 
 End 
The  1  /  1  page  total: 4