Metallurgical Industry
The comprehensive utilization project of industrial waste gas and heat from Chongqing Iron & Steel (Group) Co. Ltd with the total installed capacity of 354MW can meet more than 75% of the electricity demand of the new plant of Chongqing Iron & Steel, basically realize the recovery of all the released gas, and save 750,000 tons of standard coal annually.
Chuanwei Dry Coke Quenching and Sintering Waste Heat Power Plant: A project that can save 138,000 tons of standard coal and reduce carbon dioxide emission by 333,000 tons every year.