CECEP Solar Fully Committed to Ensuring Uninterrupted Power Supply for the Asian Games

In order to ensure the smooth hosting of the Asian Games, CECEP Solar, driven by a strong sense of responsibility and mission, spares no effort in ensuring reliable electricity supply for the event, effectively safeguarding the success of the Asian Games.

In the eastern region of China, CECEP Solar has three power stations in Zhejiang province with a total capacity of 610 megawatts. Recently, each power station has conducted in-depth special inspections and defect correction activities, strengthening equipment operation and maintenance management to ensure the safe and stable operation of the power stations. From September until the end of the Asian Games, the power stations in Hangzhou, Huzhou and Ningbo are expected to deliver a total of 110 million kilowatt-hours of electricity. In addition to ensuring daily power supply, efforts are being made to enhance the inspection of network communication security, improve the defense capabilities and reliability of network security. Regarding security management, further measures are being taken to strengthen security measures and establish a solid defense line for safety production, contributing the efforts of a central enterprise to host a "simple, safe and exciting" sports event.